Electricians arrived on Thurs. 11-13-08. Installed outside boxes and main feed wire . They were back on Friday to install receptical and light switch boxes. Electricians arrived early this mourning and ran all the wire including cable and telephone. Met with Diane(Cabinetry Designer from Dean Lumber) and signed all paperwork for kitchen and bathroom cabinets. Diane came later today to show Tommy Tennyson(Cabinet maker from Dean Lumber) the job site. SMECO was by also to check out job site. They will be back to connect main feed line to Memaw and our meter boxes.

Accessing the house via the Lockman attic.

The new meter boxes together.