Tuesday, November 4, 2008

November 4, 2008

Main entrance door installed. Vinyl siding finished on side and front. Shutters installed. Shower unit was set in mortar. Air Handler placed in attic and all rough in was done for heating and AC. Pocket doors that are on either side of the bathroom are framed.







Air handler before being installed.








Pocket door - note the metal. This way there will be less doors to have swinging in either the kitchen or Memaw's bedroom/bathroom entrance.


The shower stall. This will certainly make it a lot easier to give showers.




No comments: