Thurs. 12-04-08 Smeco arrived to bury underground wire connecting meter box to main line coming from the road. Lockman meter moved and reconnected. Electricians hooked main wire coming from new location of Lockman meter box to our fuse box in the basement. Heating and A/C crew arrived and hooked up Memaw's heat. Installation Dept. of Dean Lumber called and kitchen cabinets will be installed the first week of Jan.
Fri. 12-05-08 Drywall men taped and applied mud to the bottom half of the addition.
Sat. 12-06-08 Drywall men were back to finish taping and applying mud to the top half of the walls and the ceiling. It looks great.