Wednesday, December 3, 2008

Tuesday 12-2-08 & Wednesday 12-3-08

Tues. 12-2-08 drywall installed. yes, it's purple and green and it's for preventing moisture because the "house" is on a slab. Electricians came by to prepare for SMECO to connect main feed line on Thurs. 12-4-08 which will provide heat and electric to the house. Plumber was here to drill hole to connect ice maker line. Requested delivery of hot water heater, pipe and valves needed.(Camera was on wrong setting. All pictures taken today were dark. Sorry)

12-03-08 Hot water heater,copper pipe and valves delivered from Thomas Somerville. Heating and A/C crew placed outside unit on the side of the Memaw's addition & thermostat inside preparing for SMECO. Once main line is connected by SMECO, they will be back to turn the heat on.